WIKI / BUILDINGS

Moon Sweepers Buildings — Pieces, Prices & Placement

Plan a base that leaves room for work and expansion. Browse 98 build-menu pieces, compare structure prices and finishes, and check movement and refund rules before rebuilding.

FIELD GUIDE / LUNAR OPERATIONSMOON SWEEPERS WIKI
1 entries
buildings

Building Tool

Open the build menu to place equipment or rearrange your base. Check the $50 tool price, move controls and refund rules before relocating a production line.

Base price
$50

Machines and Robots in the Build Menu

EquipmentPriceSection
Packager$100Logistics
Splitter$5Logistics
Conveyor Belt$0.5 / mLogistics
Pressure Chamber$500Production
Merger$5Logistics
Stone Press$1000Production
Capsule Catcher$1500Services
Garage$200Services
Solar Tracker (L)$300Power
Solar Post (S)$75Power
Solar Twin (M)$150Power
Robot Vacuum Mk I$250Robots
Robot Vacuum Mk II$500Robots
J.O.O.N.A.S.$20000Robots
Source: Wikily · buildings ↗

All 84 structure prices

84 / 84 entries
StructureBase price
Railing - full edge$5
Wall - full$90
Wall - half$45
Wall - third$30
Window wall - full$115
Window wall - half$70
Window wall - third$55
Sliding door wall - full$145
Sliding door wall - half$100
Sliding door wall - third$85
Compact return stairs$85
Landing connector - 3 x 2 m$45
Foundation - 1 m$2
Foundation - 2 m$3
Foundation - 3 m$4
Ramp - 0 → 1 m$2
Ramp - 0 → 2 m$3
Ramp - 0 → 3 m$4
Stairs - 0 → 1 m$2
Stairs - 0 → 2 m$3
Stairs - 0 → 3 m$4
Roof$30
Upper floor$35
Stairwell floor$40
Foundation - 0.25 m$1
Foundation - 0.5 m$1
Foundation - 4 m$5
Foundation - 5 m$6
Foundation - 6 m$7
Foundation - landing pad$6
Stilt platform - 2 m$8
Stilt platform - 3 m$9
Stilt platform - 4 m$10
Half foundation$1
Quarter foundation$1
Three-quarter foundation$2
Triangle foundation$1
Chamfered foundation$2
Octagon foundation$2
Rounded corner foundation$2
Cove foundation$2
Rounded end foundation$2
Rounded square foundation$2
Quarter circle foundation$2
Half circle foundation$1
Circle foundation$2
Walkway$1
Walkway corner$1
Walkway curve$1
Walkway T$1
Walkway cross$1
Half curve foundation$1
Corner ramp - outer$2
Corner ramp - inner$2
Foundation wall - 1 m$1
Foundation wall - 2 m$2
Foundation wall - 4 m$3
Foundation wall - doorway$3
Foundation wall - windows$3
Curved wall - 4 m radius$2
Curved wall - 8 m radius$3
Wall corner post - 1 m$1
Wall corner post - 2 m$1
Wall corner post - 4 m$1
Catwalk - 2 m$1
Catwalk - 4 m$2
Catwalk - wide 4 m$3
Catwalk - corner$1
Catwalk - T junction$1
Catwalk - crossing$1
Catwalk - curve$2
Catwalk - 3 x 3 platform$4
Catwalk - wide to narrow$3
Catwalk - 8 m bridge$5
Catwalk stairs - 1.6 m$4
Catwalk stairs - 3.25 m$6
Catwalk stairs - wide 1.6 m$5
Catwalk stairs - quarter turn$9
Catwalk stairs - spiral$10
Catwalk ramp - 1.6 m$5
Catwalk support - 1.6 m$1
Catwalk support - 3.25 m$1
Catwalk support - wide 1.6 m$1
Catwalk support - wide 3.25 m$2

All five source directory pages reviewed. Dimensions contained in names distinguish height, width or radius variants. Structure finishes do not change the listed price.

Source: Wikily · buildings ↗

Build Menu Rules and Styles

All 98 pieces are paid from crew funds. The 84 structures include foundations, walls, floors, roofs, railings and catwalks. Removing structures or belts refunds their full price.

Use R with the Building Tool to move a piece and the objects standing on it. Check belt connections afterward. Square foundation pieces offer Concrete, Diamond Plate, Grating, Lit and Hazard Stripes finishes at the same price.

Continue exploring